Pre-cast piling work for the construction of Proposed Mihisaru Resource Management Training Centre at Karadiyana

Pre-cast pile driving for the above project is at the final stage. This project consists of supply and driving 103 number of pile point with the 300x300mm, 355x355mm and 400x400mm pile sizes. To the date, 96 number of pile points have completed (about 93%). Our project period is 3months and its due date is 2nd October 2018.

  • Location: Garbage Dump site at Karadiyana
  • Year: 2018
  • Client: Waste Management Authority (Western Province) Ltd.
  • Date: November 9, 2018

ELS International Pvt Ltd

ELS International Pvt Ltd, a proud subsidiary of ELS Group of Companies, extends its legacy of excellence to the Maldives. With a strong foundation in Sri Lanka's engineering and construction industry since 1991, we are committed to delivering high-quality, reliable, and sustainable solutions—ensuring timely and exceptional service to our valued clients.

ELS International (Pvt) Ltd

Leo Office Complex, 2nd Floor, Hulhumale plot 10693 (M3-60), Haivakaru Magu, Malé 20057
+960 330 7780
Hotline +960 790 8053 | +960 790 6002
info@elsintnl.com.mv
Follow us on Social Media

© 2025 All rights reserved. ELS International Pvt Ltd